Some of the latest photos:
Floor in the master bedroom is almost installed. Tough on the knees, let me tell you.

This is why no one has been able to get there for a week.

Bob at work on sanding wood for trim in the great room.

Still waiting on backsplash and appliances, but look at those lights!!

Master bath/sink area with marble countertops, lovely!

The most beautiful shower (before faucets it seems)...marble, slate and rock floors.

The tub in place with mosaic tub front and marble tub surround, also before faucets in place. Guess I need to take some more photos.
The plumbers and electricians, as well as the tilers have been very busy. Since the last update the countertops have been installed in the kitchen and bathrooms, the faucets and toilets have been placed and the light fixtures are 90% hung or mounted! It is looking like a real house we could live in soon. Our plans are to move out of the rental at the end of this month.
Since last week, however, no one has been able to get to the site to finish up their respective jobs. We've had non stop snow that has prevented the craftsmen (with their panel type trucks) from getting to the site. Bob and I have been a few times in a 4 wheel drive, and will be back there tomorrow.